CLIMATE AND TEMPERATURE

This product is made all around the world in wet/dry and hot/cold conditions.

Wet/Dry Conditions:

When making the Bitumendâ„¢ Coldmix product the aggregate/stone must be dry with no more than 3% moisture content and preferably less. We recommend the aggregate be stored under cover to ensure it is dry when being mixed with the binder and the product is being made.

Hot/Cold Conditions:

The softness of the product varies and is softer the hotter the temperature gets but does not affect the quality of the repair. After practical experience making the product, if a client wants to vary the formula to suit their different seasons, we can create a winter and summer formulation which will work best for them in their unique climactic conditions.